Consultation for this project has now concluded.
Consultation on Phase 1 has concluded. The results of the consultation can be found in the Document Library.
Work on the implementation of Norah Head Village Masterplan is progressing with the following Phase 1 projects:
- a shared pathway and footpath along Bungary Rd from Victoria Street to Wilfred Barrett Drive
- street plantings, parking improvements and kerb and guttering works for Bungary Road
- pedestrian links between the Village Centre and Mazlin Reserve
- upgrade of Mazlin Reserve including new amenities, playspace, pathways and landscaping
Concept drawings for parking improvements and pedestrian links between the Village Centre and Mazlin Reserve have been completed and designs for Mazlin Reserve are currently being finalised.
Construction has begun on stage one of the footpath located on the western side of Bungary Road between Victoria Street and Maitland Drive.
Council has contacted property owners regarding the design and construction of a 3m shared pathway on the eastern side of Bungary Road between Victoria Street and Maitland Drive, with works expected to commence in April 2019.
The new amenities block in Mazlin Reserve opposite the Norah Head Community Hall has been built and was completed in June 2019.
Background
Council formally adopted the Norah Head Village Centre Masterplan on 18 December 2017. The detailed implementation plan includes 51 projects, within the eight project areas. These have been assessed as low, moderate or high priority based on the feedback of stakeholders.
Council commenced the preparation of a Masterplan for the Village Centre of Norah Head in March 2016.
The aim of the Masterplan was to develop a vision, framework and action plan to address identified community and environmental planning issues within the Village Centre.
The key locations of the Study Area include the Village Centre, Cabbage Tree Bay, Rock Pool, Boat ramp, Mazlin Reserve, Sportsground, Bush Street Reserve and Young Street Reserve.
Key objectives of the Masterplan are:
- Strengthen the Village Centre and reinforce the role of Mitchell St as a hub.
- Encourage safe pedestrian movements throughout Norah Head.
- Create safe and legible cycling connections throughout the Study Area.
- Incorporate legible and consistent signage throughout Norah Head to assist in way finding and promotion of attractions and events.
- Enhance existing open space and streetscape improvements.
- Identify and strengthen significant visual links throughout the Study Area.
- Investigate traffic management options and explore opportunities to improve car parking in the Village centre.
- Improve connectivity and way finding to key attractions.
- Create opportunities to interpret the rich history and heritage of the area.
The preparation of the Masterplan involved extensive engagement with key stakeholders and the community. A number of internal staff workshops were undertaken along with one-on-one meetings with external stakeholders.
Two community workshops were held during preparation of the Masterplan with over 50 community members providing feedback on the concepts and key projects proposed in the draft plan. The key projects were subsequently amended to reflect community feedback received.
Contact Us
Have questions or want to learn more about a project, contact us below:
Website | www.centralcoast.nsw.gov.au/ |
---|---|
In writing | Gosford 91-99 Mann Street Gosford NSW 2250, Australia P. 02 4306 7900 Wyong 2 Hely StreetWyong NSW 2259, Australia P. 02 4306 7900 |